Making Wright Right

Land Mark Documents

This shows more clearly the salt build up. The lack of insulation under the radiant floor not only meant that we pumped heat deep into the ground during the winter, but that the coolness of the ground during the summer led the floor to be a great condenser of moisture.

The house has this wonderful sunken garden in from which completes the circle designs started by the house. The berm limits access from the north, except for what can be brought in through the tunnel. For a construction project like this we had to have access for things like lumber, roofers, ways to haul out the old floor........

One of the things within my skills was to dismantle the stone planter on the east end of the house and pray I could later restore it. I won't bore you with my shots of the carefully placed stones in a pattern I hoped to duplicate...... This removal gave just enough room for the bobcat ( to show up soon ) to follow the walk in front of the house and enter via the center double doors

Here you can the removal stage of the radiant floor replacement. Energy studies done in 1979 estimated that the floor could easily be a 20% contributor to the high energy bills. The lack of insulation between the earth under the pipes and the air layer between the settled heated gravel bed and the concrete floor were responsible. In fact, there was a layer of air insulating the floor from the heat below it. Since the floor acted as footings for the window wall, we left a 10" strip under the wall and slated it over in the final phase.

This was quite the site. Seeing this bobcat going in and out of the double doors with sections of the floor in its mouth

How would you like to see this in your living room. There are times I don't believe it was any harder on the house than kids. Just a little more efficient

Notice how the gravel had settled around the pipes. There was indeed quite an air gap. The heat was conducted down by the earth, but insulated from above. Yes, the floor still got toasty warm to my toes, it just cost more to do it. I was amazed at the actual condition of the pipes. I was expecting the gravel and moisture and time to have done serious damage to the pipes. In actuality, only near the fireplace where rain came in were the pipes rusted out. Some places never drained and burst in the two years the house sat empty and unheated. The broken places and heating costs justified the repair costs. The impact of the color change was an added plus.

Guess where the broken pieces of stone trimmings ended up?

From here, we start replacing the floor and pool. We needed to bring in sand to level up the floor before installing new pool plumbing and the new radiant floor. After years of cleaning mud and gunk out of the indoor pool, when it housed fish and plants, I made a change. The original drawings of the house display a hemispherical pool. Half outside and half in. The separating material is glass under the window wall. Not very practical for where the house was built. Herb Jacobs decided on a plunge pool outside and a fish pond inside. I changed it to two plunge pools with whirlpool jets inside and plumbing for the same outside. When Herb and Catherine came by to see the house after the restoration, Herb said "I never thought of that". It was wonderful to sit in this house after a long day and read in the whirl pool. All the color, stone, wood, and lighting effects......... Some have had problems with this change.

Return to Making Wright Right Home Page


Send your questions and comments to: info2@expertsondemand.org
Copyright © 2009 Bill Taylor,
All Rights Reserved
Last modified: 3/8/2009